Tugas Akhir Elektro
ANALISIS UNJUK KERJA SISTEM DISTRIBUSI 20 KV DARI GH SENGGIGI DAN GH TANJUNG AKIBAT INJEKSI DAYA DARI PEMBANGKIT ENERGI TERBARUKAN
The development of power generation systems using renewable energy resources which is located near load centers known as Distributed Generation (DG). Distributed Generation is a small-capacity plant located on the electricity distribution system and usually placed on the buses that connect directly to the load.
This research analyzes the performance of 20kV distribution system from GH Senggigi and GH Tanjung as a result of power injection from Renewable Energy Generation by using ETAP 2.6.0 software.
The result of this research in LBS sire close and open condition by the change of maximum load (night) and minimum load (during the day) show that the resulting of voltage profile is getting better as a result of power injection from PLTM Segara and PLTS 3 Gili, and the total of power loss will be smaller than without power injection. Because of power injection from PLTM Segara at maximum load (night) and power injection from PLTM Segara and PLTS 3 Gili at minimum load
Tidak ada salinan data
Tidak tersedia versi lain